Maria Cecilia Hospital – Cotignola (RA) 2012
Work status: completed
Intervention description: Superelevation and Widening
Specialised in the design of private and public health/hospital building such as hospitals, clinics and SPA.
Gedi Group is active in public procurement and has developed a specific know-how in design and construction of public and private hospitals, clinics and nursing homes as well as the upgrading and modernization of existing facilities.
The numerous works have allowed to develop a strong experience in designing and manufacturing hospital areas with a high concentration of technology, such as image departments, operating blocks and intensive care units.
Gedi group in order to satisfy in optimal way the requirements of the customers can today count on remarkable organizational and managerial skills, on a high professional level of its staff, and on an elevated number of ways and equipments of vanguard that make possible to carry to term numerous store clerks at the same time.
The multidisciplinary capabilities developed by the company enable it to manage every stage of the project: from the feasibility to preliminary and detailed design, to supplying of all the materials, to the construction of the civil works, to the supply of technological installations (mechanical, electrical and special installations) of the building. These skills make it highly competitive in executing turnkey projects.
When developing its projects, Gedi Group pays special attention to safeguarding the environment, offering solutions which limit the environmental impact of the works and optimize energy consumption, also through innovative proposals such as cogeneration and renewable energy.
Gedi Group, through relationships with some of the most important design studios (Prof. Gianni Plicchi, etc.) is able to offer public and private clients consulting services in various fields: technical, financial, legal and tax.
Work status: completed
Intervention description: Superelevation and Widening
Renovation and extension works
Amount of work: € 21.191.245,20
Work status: completed
Realization of 2 new buildings in the new hospital area of Olbia
Amount of work: € 21.356.496,00
Performing company: Gruppo GeDi
Total area: 40.009 m2
Beds in ordinary hospitalization and Day Hospital for medical, surgical, adult and child patients: 215
Performing companies:”Costruzioni Pallotta S.r.l.” di Altamura (Ba) – “Gruppo Gedi S.r.l.” di Altamura (Ba)
Amount of work: € 17 000 000,00
Renovation and extension of the building
Amount of work: € 5.940.499,41
Work status: completed
Ospedale SS. Annunziata Palazzina F
Customer:
Performing company: Gruppo GE.DI.
San Pietro Damiano Hospital – Faenza
Customer:
Performing company: Gruppo GE.DI.
Health centre – Castrocaro Terme
Customer:
Performing company: Gruppo GE.DI.
Building works and plants for the complete renovation of the entire building. Underground extension and New Stairs and Lifts block.
Amount of work: €. 8 300 000,00
Orthopedic Institute Rizzoli – Bologna (BO)
Work status: completed
Redevelopment Acceptance, Departments Hospitalization, new departments. Performing companies: Costruzioni Pallotta S.r.l. – Gruppo Gedi S.r.l.